跳到主要导航 跳到搜索 跳到主要内容

Throughput-delay analysis of one-to-many wireless multi-hop flows based on random linear network coding

  • Beihang University

科研成果: 期刊稿件文章同行评审

摘要

This paper addresses the issue of throughput-delay of one-to-many wireless multi-hop flows based on random linear network coding (RLNC). Existing research results have been focusing on the single-hop model which is not suitable for wireless multi-hop networks. In addition, the conditions of related system model are too idealistic. To address these limitations, we herein investigate the performance of a wireless multi-hop network, focusing on the one-to-many flows. Firstly, a system model with multi-hop delay was constructed; secondly, the transmission schemes of system model were gradually improved in terms of practical conditions such as limited queue length and asynchronous forwarding way; thirdly, the mean delay and the mean throughput were quantified in terms of coding window size if and number of destination nodes N for the wireless multi-hop transmission. Our findings show a clear relationship between the multi-hop transmission performance and the network coding parameters. This study results will contribute significantly to the evaluation and the optimization of network coding method.

源语言英语
文章编号6608222
页(从-至)430-438
页数9
期刊Journal of Communications and Networks
15
4
DOI
出版状态已出版 - 2013

指纹

探究 'Throughput-delay analysis of one-to-many wireless multi-hop flows based on random linear network coding' 的科研主题。它们共同构成独一无二的指纹。

引用此