Study on the organization and work breakdown structure of the international academic conference event management - Take the 38th International Conference on Computers and Industrial Engineering for Example

  • Di Zhang*
  • , Xiuquan Deng
  • , Rongjun Zou
  • *此作品的通讯作者
  • Beihang University

科研成果: 书/报告/会议事项章节会议稿件同行评审

摘要

The characteristics of international academic conference is analyzed specifically, the principle and process to design the organization structure and work breakdown structure (WBS) of international academic conference are proposed on the basis of the theory of event management and work breakdown structure in project management. Then the reference organization structure and general WBS of international academic conference are built. Finally, the actual value of the research is showed by being applied into the 38th International Conference on Computers and Industrial Engineering (CIE) and generating the specific responsibility matrix .A suitable way for the majority of international academic organizations can be attempted to explore to make the organization of international academic conference more subtle, specific, greater controllability.

源语言英语
主期刊名IE and EM 2009 - Proceedings 2009 IEEE 16th International Conference on Industrial Engineering and Engineering Management
1611-1615
页数5
DOI
出版状态已出版 - 2009
活动2009 IEEE 16th International Conference on Industrial Engineering and Engineering Management, IE and EM 2009 - Beijing, 中国
期限: 21 10月 200923 10月 2009

出版系列

姓名IE and EM 2009 - Proceedings 2009 IEEE 16th International Conference on Industrial Engineering and Engineering Management

会议

会议2009 IEEE 16th International Conference on Industrial Engineering and Engineering Management, IE and EM 2009
国家/地区中国
Beijing
时期21/10/0923/10/09

指纹

探究 'Study on the organization and work breakdown structure of the international academic conference event management - Take the 38th International Conference on Computers and Industrial Engineering for Example' 的科研主题。它们共同构成独一无二的指纹。

引用此