T1 - Study on the breakeven point of human transportation distance in mechanized construction of 220kV and 500kV overhead transmission lines
AU - Congyu, Lin
AU - Ziqiang, Tang
AU - Yan, Yan
AU - Quan, Liu
AU - Fuhai, Liu
AU - Ruijun, Liu
AU - Weiyu, Chen
N1 - Publisher Copyright:
© 2025 IEEE.
PY - 2025
Y1 - 2025
N2 - Mechanized construction is an important part of State Grid Corporation, and mechanized construction of overhead transmission lines in mountainous areas is a major challenge. The breakeven point of human transportation distance is an important indicator for selecting tower locations for mechanized construction in mountainous areas. This paper is based on a survey of the foundation types of mechanized construction in mountainous areas, discussed the cost calculation differences between mechanized construction of overhead transmission lines and conventional construction and analysis the breakeven point for typical terrain conditions of 220kV and 500kV lines, the results show that: (1) the breakeven points are between 63-125m on 220kV transmission line, and that of 500kV transmission line is 233-421m which is higher than that of 220kV and 110kV.(2) The breakeven point of rock anchor foundation is greater than that of mechanized pile foundations on same condition, indicating that the economic benefits of rock anchor foundations are relatively high.
AB - Mechanized construction is an important part of State Grid Corporation, and mechanized construction of overhead transmission lines in mountainous areas is a major challenge. The breakeven point of human transportation distance is an important indicator for selecting tower locations for mechanized construction in mountainous areas. This paper is based on a survey of the foundation types of mechanized construction in mountainous areas, discussed the cost calculation differences between mechanized construction of overhead transmission lines and conventional construction and analysis the breakeven point for typical terrain conditions of 220kV and 500kV lines, the results show that: (1) the breakeven points are between 63-125m on 220kV transmission line, and that of 500kV transmission line is 233-421m which is higher than that of 220kV and 110kV.(2) The breakeven point of rock anchor foundation is greater than that of mechanized pile foundations on same condition, indicating that the economic benefits of rock anchor foundations are relatively high.
KW - breakeven point
KW - human transport distance
KW - mechanized construction
KW - mechanized pile foundation
KW - rock anchor foundation
KW - transmission line
KW - voltage
UR - https://www.scopus.com/pages/publications/105010181341
U2 - 10.1109/SGAI64825.2025.11009735
DO - 10.1109/SGAI64825.2025.11009735
M3 - 会议稿件
AN - SCOPUS:105010181341
T3 - 2025 2nd International Conference on Smart Grid and Artificial Intelligence, SGAI 2025
SP - 1218
EP - 1223
BT - 2025 2nd International Conference on Smart Grid and Artificial Intelligence, SGAI 2025
PB - Institute of Electrical and Electronics Engineers Inc.
T2 - 2nd International Conference on Smart Grid and Artificial Intelligence, SGAI 2025
Y2 - 21 March 2025 through 23 March 2025
ER -