Study of cost-time-quality in project failure risk assessment based on monte carlo simulation

  • Xing Pan
  • , Zi Ling Xin*
  • *此作品的通讯作者
  • Beihang University

科研成果: 书/报告/会议事项章节会议稿件同行评审

摘要

In order to analyze project failure risk, the quality factor, added on the basis of cost-time joint risk assessment, are showed by the degree of deviation and expressed by 2-norm firstly. Secondly, considering the cost-time-quality factors jointly, the joint distribution model of cost-time based on the Monte Carlo model is established; meanwhile, the definition of project failure risk value is given. Last, an example is given based on Program Evaluation Review Technique (PERT) to simulate and analyse project failure risk through Monte Carlo Simulation (MCS).

源语言英语
主期刊名19th International Conference on Industrial Engineering and Engineering Management
主期刊副标题Assistive Technology of Industrial Engineering
出版商Springer Science and Business Media Deutschland GmbH
1361-1368
页数8
ISBN(印刷版)9783642383908
DOI
出版状态已出版 - 2013
活动19th International Conference on Industrial Engineering and Engineering Management: Assistive Technology of Industrial Engineering - Changsha, 中国
期限: 27 10月 201229 10月 2012

出版系列

姓名19th International Conference on Industrial Engineering and Engineering Management: Assistive Technology of Industrial Engineering

会议

会议19th International Conference on Industrial Engineering and Engineering Management: Assistive Technology of Industrial Engineering
国家/地区中国
Changsha
时期27/10/1229/10/12

指纹

探究 'Study of cost-time-quality in project failure risk assessment based on monte carlo simulation' 的科研主题。它们共同构成独一无二的指纹。

引用此