跳到主要导航 跳到搜索 跳到主要内容

Simulation Design of Shop Material Supply Based on Queuing Theory

  • Beihang University

科研成果: 书/报告/会议事项章节会议稿件同行评审

摘要

Through the field research on the material supply system of a processing workshop, this paper finds that there are such problems as material accumulation, messy material placement space and large occupied space in the processing system, which have greatly affected the improvement of production efficiency. In this paper, we use Em-Plant simulation software to model the material supply system, and use the basic method of queuing theory to analyze the average captain, average waiting time and average stay time under steady-state conditions. Simulations were performed and the optimized system was significantly improved.

源语言英语
主期刊名Proceedings - 2018 IEEE 18th International Conference on Software Quality, Reliability, and Security Companion, QRS-C 2018
出版商Institute of Electrical and Electronics Engineers Inc.
258-263
页数6
ISBN(印刷版)9781538678398
DOI
出版状态已出版 - 9 8月 2018
活动18th IEEE International Conference on Software Quality, Reliability, and Security Companion, QRS-C 2018 - Lisbon, 葡萄牙
期限: 16 7月 201820 7月 2018

出版系列

姓名Proceedings - 2018 IEEE 18th International Conference on Software Quality, Reliability, and Security Companion, QRS-C 2018

会议

会议18th IEEE International Conference on Software Quality, Reliability, and Security Companion, QRS-C 2018
国家/地区葡萄牙
Lisbon
时期16/07/1820/07/18

指纹

探究 'Simulation Design of Shop Material Supply Based on Queuing Theory' 的科研主题。它们共同构成独一无二的指纹。

引用此