跳到主要导航 跳到搜索 跳到主要内容

Risk Assessment of Railway Transportation Systems using Timed Fault Trees

  • Zhaoguang Peng
  • , Yu Lu*
  • , Alice Miller
  • , Chris Johnson
  • , Tingdi Zhao
  • *此作品的通讯作者
  • Beihang University
  • University of Glasgow

科研成果: 期刊稿件文章同行评审

摘要

Safety is an essential requirement for railway transportation. There are many methods that have been developed to predict, prevent, and mitigate accidents in this context. All of these methods have their own purpose and limitations. This paper presents a new useful analysis technique: timed fault tree analysis. This method extends traditional fault tree analysis with temporal events and fault characteristics. Timed fault trees (TFTs) can determine which faults need to be eliminated urgently, and it can also provide how much time have been left at least to eliminate the root failure to prevent accidents. They can also be used to determine the time taken for railway maintenance requirements, and thereby improve maintenance efficiency, and reduce risks. In this paper, we present the features and functionality of a railway transportation system, and principles and rules of TFTs. We demonstrate the applicability of our framework by a case study on a simple railway transportation system.

源语言英语
页(从-至)181-194
页数14
期刊Quality and Reliability Engineering International
32
1
DOI
出版状态已出版 - 1 2月 2016

指纹

探究 'Risk Assessment of Railway Transportation Systems using Timed Fault Trees' 的科研主题。它们共同构成独一无二的指纹。

引用此