Resource-constraint Multi-project Scheduling with Priorities and Uncertain Activity Durations

  • Zheng Zheng*
  • , Lin Shumin
  • , Guo Ze
  • , Zhu Yueni
  • *此作品的通讯作者
  • Science and Technology on Aircraft Control Laboratory
  • Beihang University

科研成果: 期刊稿件文章同行评审

摘要

Resource-constraint multi-project scheduling is one of the most important topic in the field of project management. Most current works solve this problem based on an idea that multiple projects can be simply emerged into a super-project in a deterministic environment, regardless of the project priority and robustness of schedules. This paper discusses the RCMPSP with priority and formulates a discrete bi-objective decision model. A modified NSGA-II based algorithm is presented to solve the model. Furthermore, we design systematic experiments to investigate the interrelationship between robustness and its related project parameters, including order strength, resource constrainedness and uncertainty level. The results demonstrate the effectiveness of the solution algorithm and show that the three parameters indeed have evident impacts on the robustness and makespan of projects.

源语言英语
页(从-至)530-547
页数18
期刊International Journal of Computational Intelligence Systems
6
3
DOI
出版状态已出版 - 5月 2013

指纹

探究 'Resource-constraint Multi-project Scheduling with Priorities and Uncertain Activity Durations' 的科研主题。它们共同构成独一无二的指纹。

引用此