T1 - Research on monitoring and forecasting of project performance based on stochastic S curves
AU - Xu, Zhe
AU - Wang, Yang Qing
AU - Wang, Shu
PY - 2009/2/20
Y1 - 2009/2/20
N2 - Stochastic S curves (SS curves) consider about the probabilistic characteristics of cost and duration, and show the relationship between cost, duration and project progress. Based on SS curves, new parameters of cost variation (CV) and schedule variation (SV) were proposed to realize the monitoring of project performance. Considering the correlation between the past performance and the future performance, according to the cost performance indices (CPI) and schedule performance indices (SPI) of actives or project, the cost and time parameters of the activity which was in process or which was not started were adjusted. Then, using the simulation method, the cost variation at completion (CVAC) and the schedule variation at completion (SVAC) were obtained, and the forecasting of project performance was realized. Finally, a case study involving a 3-story housing project was performed to verify the capability and utility of the new method of performance monitoring and forecasting based on SS curves in the real world.
AB - Stochastic S curves (SS curves) consider about the probabilistic characteristics of cost and duration, and show the relationship between cost, duration and project progress. Based on SS curves, new parameters of cost variation (CV) and schedule variation (SV) were proposed to realize the monitoring of project performance. Considering the correlation between the past performance and the future performance, according to the cost performance indices (CPI) and schedule performance indices (SPI) of actives or project, the cost and time parameters of the activity which was in process or which was not started were adjusted. Then, using the simulation method, the cost variation at completion (CVAC) and the schedule variation at completion (SVAC) were obtained, and the forecasting of project performance was realized. Finally, a case study involving a 3-story housing project was performed to verify the capability and utility of the new method of performance monitoring and forecasting based on SS curves in the real world.
KW - Forecasting of project performance
KW - Integrated control of cost and schedule
KW - Monitoring of project performance
KW - Monte Carlo simulation
KW - Stochastic S curves
UR - https://www.scopus.com/pages/publications/62249222533
M3 - 文章
AN - SCOPUS:62249222533
SN - 1004-731X
VL - 21
SP - 1187-1191+1194
JO - Xitong Fangzhen Xuebao / Journal of System Simulation
JF - Xitong Fangzhen Xuebao / Journal of System Simulation
IS - 4
ER -