Project scheduling based on risk mitigation: Case study of an aviation equipment R&D project

  • Beihang University
  • Harbin Engineering University

科研成果: 书/报告/会议事项章节会议稿件同行评审

摘要

The problem of project scheduling based on risk mitigation attracted researchers' attention in recent years. A few researchers provide some models and approaches to the problem. In this study, we apply Kiliç, Ulusoy and Şerifoǧlu's model to research a real-life case of aviation equipment R&D project. A convenient and effective solution approach is provided. In the solution approach, we discuss how to give acceptable and appropriate parameters. The results show that the model is applicable to some projects and some situations, but it has to be improved for aviation equipment R&D projects.

源语言英语
主期刊名Conference Proceedings of the 4th International Symposium on Project Management, ISPM 2016
编辑Xi Shen Cao, Henry Zhang, Chang Bo Cheng
出版商Aussino Academic Publishing House
346-352
页数7
ISBN(电子版)9781921712487
出版状态已出版 - 2016
活动4th International Symposium on Project Management, ISPM 2016 - Wuhan, 中国
期限: 9 7月 201610 7月 2016

出版系列

姓名Conference Proceedings of the 4th International Symposium on Project Management, ISPM 2016

会议

会议4th International Symposium on Project Management, ISPM 2016
国家/地区中国
Wuhan
时期9/07/1610/07/16

指纹

探究 'Project scheduling based on risk mitigation: Case study of an aviation equipment R&D project' 的科研主题。它们共同构成独一无二的指纹。

引用此