摘要
On the basis of the analysis of spares supply performance measures such as spares support probability, operational availability, supply availability, fill rate, complete rate and backorders, the concept of the integrated supply performance measure is introduced. The connotation and the mathematical formula of the measure are built, and the function and the application scope of the measure arc analyzed. The model of optimization of spares requisition configuration with the integrated supply performance measure being objective and the cost being constraint is built, and the optimization algorithm based on marginal analysis is proposed. Finally the model is concretely analyzed by a case.
| 源语言 | 英语 |
|---|---|
| 页(从-至) | 2085-2087 |
| 页数 | 3 |
| 期刊 | Xi Tong Gong Cheng Yu Dian Zi Ji Shu/Systems Engineering and Electronics |
| 卷 | 29 |
| 期 | 12 |
| 出版状态 | 已出版 - 12月 2007 |
学术指纹
探究 'Optimization of spares supply based on integrated supply performance measure' 的科研主题。它们共同构成独一无二的学术指纹。引用此
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver