跳到主要导航 跳到搜索 跳到主要内容

Optimization of concession period for public private partnership toll roads

  • Ke Feng
  • , Shouqing Wang
  • , Chunlin Wu
  • , Guangtao Xia
  • , Wangyin Hu
  • Beijing University of Civil Engineering and Architecture
  • Tsinghua University
  • Beihang University

科研成果: 期刊稿件文章同行评审

摘要

In the past decades, public private partnership (PPP) has been widely used as an effective approach to stimulating private investment and improving supplies for public services. The optimization of the concession period is very critical for the successful implementation of PPP projects. This paper takes decision making activities of the concession period as a bargaining game process between public and private sectors, and presents a mathematical model to calculate the optimal concession period under a series of assumptions. Backward induction is applied to solve this optimization problem. Finally, numerical simulation is used to further verify the model and analyze the influence of different factors on the optimal concession period. The results indicate that the optimal toll rate should be determined based on the average level of service provided. Factors such as the risk interest rate, initial investment, reservation utility are positively correlated with the optimal concession period, while the private equity ratio and the toll rate are negatively correlated with it. The current study is a useful supplement to previous research works as it incorporates the influence of public equity and time value of money into the construction of model. Moreover, it can act as a helpful reference for both public and private sectors in negotiations concerning related issues.

源语言英语
页(从-至)24-31
页数8
期刊Engineering Economics
30
1
DOI
出版状态已出版 - 2019
已对外发布

学术指纹

探究 'Optimization of concession period for public private partnership toll roads' 的科研主题。它们共同构成独一无二的学术指纹。

引用此