N2 - China is seriously affected by transmission line icing. At present, there are no effective on-line monitoring techniques of snow and ice accretion on transmission lines in China. The design of transmission lines and disaster prevention are difficult to carry out due to a conspicuous lack of historical data. This paper summarizes the monitoring methods of transmission line icing applied in engineering. Aiming at the shortages of these methods, a new on-line monitoring approach employing image processing is posed. With this method, automatic and on-line monitoring can be realized. Finally, the composition and function of the integrated monitoring system are stated in detail.
AB - China is seriously affected by transmission line icing. At present, there are no effective on-line monitoring techniques of snow and ice accretion on transmission lines in China. The design of transmission lines and disaster prevention are difficult to carry out due to a conspicuous lack of historical data. This paper summarizes the monitoring methods of transmission line icing applied in engineering. Aiming at the shortages of these methods, a new on-line monitoring approach employing image processing is posed. With this method, automatic and on-line monitoring can be realized. Finally, the composition and function of the integrated monitoring system are stated in detail.
KW - CCD image sensor
KW - On-line monitoring system
KW - Transmission line icing
UR - https://www.scopus.com/pages/publications/70349316364
U2 - 10.1109/ICIEA.2009.5138405
DO - 10.1109/ICIEA.2009.5138405
M3 - 会议稿件
AN - SCOPUS:70349316364
SN - 9781424428007
T3 - 2009 4th IEEE Conference on Industrial Electronics and Applications, ICIEA 2009
SP - 1265
EP - 1269
BT - 2009 4th IEEE Conference on Industrial Electronics and Applications, ICIEA 2009
T2 - 2009 4th IEEE Conference on Industrial Electronics and Applications, ICIEA 2009
Y2 - 25 May 2009 through 27 May 2009
ER -