摘要
The multi-mode resource-constrained project scheduling problem under uncertain activity cost (MRCPSP-UAC) has a wide range of applications in production planning and project management. We first build a new mixed-integer nonlinear programming (MINLP) model with the objective of minimizing the risk of project cost overrun, which provides a vehicle to obtain optimal solutions. To overcome the computational challenge of exact method for solving large instances, we devise a construction heuristic (CH) with a multi-pass greedy improvement procedure to obtain a feasible solution efficiently. To further improve solution quality, a hybrid CH and genetic algorithm (CH-GA) is developed with a custom fitness function to properly calibrate the quality of an individual. A comprehensive computational study is performed to examine the impact of various problem parameters on the optimal solutions, and the performance of our algorithms. Our hybrid CH-GA performs well for large instances with significantly less computational time than the exact method.
| 源语言 | 英语 |
|---|---|
| 期刊论文编号 | 114475 |
| 期刊 | Expert Systems with Applications |
| 卷 | 168 |
| DOI | |
| 出版状态 | 已出版 - 15 4月 2021 |
学术指纹
探究 'Multi-mode resource-constrained project scheduling with uncertain activity cost' 的科研主题。它们共同构成独一无二的学术指纹。引用此
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver