摘要
The scheduling problem was based on a real welding workshop in a large manufacturing enterprise. A stochastic scheduling problem consisting of m workers and n jobs was dealt with and a mathematic model was developed to minimize maximum expected value and variance of the completion time. In order to solve the problem, Binary Particle Swarm Optimization (BPSO) algorithm was modified, and a dynamic neighborhood strategy, new particle memory updating, and one-dimension optimization method were used to solve two objectives problem. A simulation example was carried out to illustrate that the improved method could efficiently find Pareto front solutions.
| 源语言 | 英语 |
|---|---|
| 页(从-至) | 3906-3909+3913 |
| 期刊 | Xitong Fangzhen Xuebao / Journal of System Simulation |
| 卷 | 21 |
| 期 | 13 |
| 出版状态 | 已出版 - 5 7月 2009 |