摘要
Public transport electrification contributes to the net-zero goal in the transport sector. However, high-power bus charging during peak hours places additional strain on the grid, while under-utilization of charging infrastructure limits its potential economic and social benefits. This study focuses on these challenges through integrated and shared optimization of battery electric buses (BEB) and shared micromobility systems (SMS) incorporating solar photovoltaic. We present a bi-level mixed-integer linear programming model (B-MILM) to jointly optimize BEB charging infrastructure, BEB charging schedules, solar PV installed capacity, and SMS charging schedule. The B-MILM is solved using a value-function-based exact approach. We derive a group of inequalities based on the problem characteristics to reduce solution time. A large-scale case study in Gothenburg, Sweden, demonstrates that solar photovoltaic and shared charging services yield annual cost savings 110% - 120% above investment costs for public transit agencies, even when the service fee revenue is excluded. Charging dispatching costs for e-scooter operators are reduced by up to 54%, and daily BEB charging grid loads decrease by 3% to 34% across seasons. The greenhouse emissions from electricity consumption of BEBs and e-scooters are reduced by 3%. The results offer new insights for sustainable charging and energy infrastructure planning and management for electric public transit.
| 源语言 | 英语 |
|---|---|
| 文章编号 | 104709 |
| 期刊 | Transportation Research Part E: Logistics and Transportation Review |
| 卷 | 208 |
| DOI | |
| 出版状态 | 已出版 - 4月 2026 |
联合国可持续发展目标
此成果有助于实现下列可持续发展目标:
-
可持续发展目标 7 经济适用的清洁能源
指纹
探究 'Integrated and shared charging optimization of electric buses and shared micromobility incorporating solar photovoltaic' 的科研主题。它们共同构成独一无二的指纹。引用此
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver