跳到主要导航 跳到搜索 跳到主要内容

Influence of behavioral factors on project schedule management: A Monte Carlo method

  • Beihang University

科研成果: 书/报告/会议事项章节会议稿件同行评审

摘要

The PERT/CPM method adopts the right-skewed probability distribution of activity duration to describe human behavioral characteristics in project activity. The parameters of distribution are given directly by estimators, which means a fixed distribution is used. However, due to the influence of 'student syndrome' and Parkinson's Law, the PERT/CPM method doesn't get a satisfying effect. The CCPM method recently studied takes account of these factors by taking advantage of the mechanism of buffers and achieves better results, nevertheless, its theoretical foundations have not been confirmed effectively. This paper employs a dynamic probability distribution of activity duration to describe the influence of 'student syndrome' and Parkinson's Law on the project, and uses Monte Carlo simulation method to investigate the influence of on the completion rate for the planned project duration. We find 'student syndrome' and Parkinson's Law can change the expectation of project completion time and as the degree of waiting and procrastination increases, the completion rate continues to decrease. Meanwhile, the principle of cutting down safety time in CCPM is also interpreted. In the end, the paper presents some managerial policies to guide the project participants' behavior and improve the project operation efficiency.

源语言英语
主期刊名2013 25th Chinese Control and Decision Conference, CCDC 2013
4831-4835
页数5
DOI
出版状态已出版 - 2013
活动2013 25th Chinese Control and Decision Conference, CCDC 2013 - Guiyang, 中国
期限: 25 5月 201327 5月 2013

出版系列

姓名2013 25th Chinese Control and Decision Conference, CCDC 2013

会议

会议2013 25th Chinese Control and Decision Conference, CCDC 2013
国家/地区中国
Guiyang
时期25/05/1327/05/13

学术指纹

探究 'Influence of behavioral factors on project schedule management: A Monte Carlo method' 的科研主题。它们共同构成独一无二的学术指纹。

引用此