跳到主要导航 跳到搜索 跳到主要内容

Heuristic for three machines flow shop scheduling problem to minimize the weighted mean flow time

  • Beihang University

科研成果: 书/报告/会议事项章节会议稿件同行评审

摘要

In practical situations, machines might not be available during certain time of period due to deterministic or stochastic causes in many production systems. And, processing times are always not exact as they have been predicted. In this paper, we attempted to study the three machines flow shop scheduling problem in which probabilities are associated with processing times of jobs involving transportation time, machine breakdown interval and weights of jobs. A simple heuristic approach is proposed to find optimal or near optimal sequence minimizing the weighted mean production flow time. A numerical example has been provided to illustrate and clarify the proposed algorithm.

源语言英语
主期刊名Material and Manufacturing Technology III
714-718
页数5
DOI
出版状态已出版 - 2012
活动3rd International Conference on Material and Manufacturing Technology, ICMMT 2012 - Chengdu, 中国
期限: 5 5月 20126 5月 2012

出版系列

姓名Advanced Materials Research
548
ISSN(印刷版)1022-6680

会议

会议3rd International Conference on Material and Manufacturing Technology, ICMMT 2012
国家/地区中国
Chengdu
时期5/05/126/05/12

学术指纹

探究 'Heuristic for three machines flow shop scheduling problem to minimize the weighted mean flow time' 的科研主题。它们共同构成独一无二的学术指纹。

引用此