TY - JOUR
T1 - Getting ready for future carbon abatement under uncertainty – Key factors driving investment with policy implications
AU - Mo, Jianlei
AU - Schleich, Joachim
AU - Fan, Ying
N1 - Publisher Copyright:
© 2018 Elsevier B.V.
PY - 2018/2
Y1 - 2018/2
N2 - Carbon capture and storage (CCS) is considered a key technology option for abating CO2 emissions in carbon-intensive sectors, e.g. the power sector. However, high investment costs and risk hinder the diffusion of CCS. To avoid stranded assets or high future costs for retrofitting, new plants can be made carbon capture ready (CCR) to enable them to accommodate future CCS retrofitting at low additional costs. Current CCR investment decisions are closely related to future CCS retrofitting and CCS operation decisions in subsequent stages, all of which would be affected by uncertainties. We develop a three-stage CCR investment decision model under multiple uncertainties which allows for investment and especially operating flexibilities. Applying this model to China shows that CCS operating flexibility under the carbon-pricing scheme may actually lower the probability of investing in a CCR plant, and neglecting it may overestimate the propensity for investing in CCR. Moreover, learning effects, which reduce the costs of future CCS retrofitting, may be detrimental to CCR investment, indicating that the policy support for research on, development of, and deployment of CCS to reduce CCS costs should be coordinated with CCR investments. Although higher electricity prices can increase the value of an investment opportunity, it may restrain CCR investment. Finally, CCR investment does not appear to be economically viable under current conditions in China because of low carbon prices, high carbon price risks, high CCR investment costs and the high opportunity costs of CCS operation.
AB - Carbon capture and storage (CCS) is considered a key technology option for abating CO2 emissions in carbon-intensive sectors, e.g. the power sector. However, high investment costs and risk hinder the diffusion of CCS. To avoid stranded assets or high future costs for retrofitting, new plants can be made carbon capture ready (CCR) to enable them to accommodate future CCS retrofitting at low additional costs. Current CCR investment decisions are closely related to future CCS retrofitting and CCS operation decisions in subsequent stages, all of which would be affected by uncertainties. We develop a three-stage CCR investment decision model under multiple uncertainties which allows for investment and especially operating flexibilities. Applying this model to China shows that CCS operating flexibility under the carbon-pricing scheme may actually lower the probability of investing in a CCR plant, and neglecting it may overestimate the propensity for investing in CCR. Moreover, learning effects, which reduce the costs of future CCS retrofitting, may be detrimental to CCR investment, indicating that the policy support for research on, development of, and deployment of CCS to reduce CCS costs should be coordinated with CCR investments. Although higher electricity prices can increase the value of an investment opportunity, it may restrain CCR investment. Finally, CCR investment does not appear to be economically viable under current conditions in China because of low carbon prices, high carbon price risks, high CCR investment costs and the high opportunity costs of CCS operation.
KW - Carbon capture ready (CCR)
KW - Carbon pricing
KW - Dynamic programming
KW - Greenhouse gas (GHG)
KW - Investment under uncertainty
UR - https://www.scopus.com/pages/publications/85044393849
U2 - 10.1016/j.eneco.2018.01.026
DO - 10.1016/j.eneco.2018.01.026
M3 - 文章
AN - SCOPUS:85044393849
SN - 0140-9883
VL - 70
SP - 453
EP - 464
JO - Energy Economics
JF - Energy Economics
ER -