跳到主要导航 跳到搜索 跳到主要内容

Flow shop rescheduling problem and its improved repair-based constraint satisfaction algorithm

  • Chun Xia Shangguan*
  • , Hong Zhou
  • , Rui Feng Shi
  • , Yang Wu
  • *此作品的通讯作者
  • Beihang University
  • North China Electric Power University

科研成果: 期刊稿件文章同行评审

摘要

A two-objective model was constructed for flow shop rescheduling problem with arrivals of new jobs. This model was designed to optimize the original performance index and to minimize differences between rescheduling result and original sequence. This model was decomposed and a two-level model was constructed so that it could be solved easily. The Improved Repair-based Constraint Satisfaction methods (IRCS) were proposed for the two-level model. A heuristic algorithm for variable ordering procedure was designed by using new variable representation, and a variable exchanging heuristic algorithm was used to escape from the local optima. Computational experiments of 90 rescheduling problems were conducted for the proposed algorithms with Nondominated Sorting Genetic Algorithm (NSGA-II) as a competitor. Results revealed the advantages of the proposed algorithms within the same running time.

源语言英语
页(从-至)1742-1751+1773
期刊Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS
14
9
出版状态已出版 - 9月 2008

指纹

探究 'Flow shop rescheduling problem and its improved repair-based constraint satisfaction algorithm' 的科研主题。它们共同构成独一无二的指纹。

引用此