跳到主要导航 跳到搜索 跳到主要内容

Design and Signal Delay Analysis of Spinning Missile Electric Rudder Control System

  • Qiushi Yao*
  • , Lijing Li
  • , Siyuan Wang
  • *此作品的通讯作者
  • Beihang University

科研成果: 期刊稿件会议文章同行评审

摘要

In order to meet the requirements of ultra-small special-purpose missiles for miniaturization, high dynamic characteristics and low signal delay of the missile-mounted rudder, and to reduce the working pressure of the navigation computer control system, a digital electric rudder control system based on MCU and H-bridge integrated power drive chip was designed and implemented. The system uses the Texas Instruments C2000 high-performance MCU as the core control unit to process the single-channel rudder position feedback signal. After the fuzzy position PID algorithm calculation, the control signal is output in the form of pulse width modulation (PWM) waveform, and the rudder control is completed by the DRV8872 power drive chip. Aiming at the problem of phase delay in missile attitude control system, the reason of delay is analyzed from the perspective of system composition. The phase delay formula is derived through theoretical calculation and sine sweep test. A method based on navigation computer deviation compensation is proposed. It has been proved by experiments that the rudder control system has good dynamic response capability and has good compensation effect on system signal delay.

源语言英语
文章编号032037
期刊IOP Conference Series: Earth and Environmental Science
440
3
DOI
出版状态已出版 - 18 3月 2020
活动2019 5th International Conference on Environmental Science and Material Application, ESMA 2019 - Xi'an, 中国
期限: 15 12月 201916 12月 2019

指纹

探究 'Design and Signal Delay Analysis of Spinning Missile Electric Rudder Control System' 的科研主题。它们共同构成独一无二的指纹。

引用此