Computational method of post-construction settlement for high-fill embankments

科研成果: 期刊稿件文章同行评审

摘要

Owing to their great height and large volume, high-fill embankments are subject to differential settlement that often reduces their safety and stability, and therefore the post-construction settlement of such embankments should be examined carefully. This paper develops a practical creep calculation method based on the finite element method for calculation of post-construction settlement by a time-dependent UH model and the simplified one-dimensional creep deformation computation method that could be combined with the layer-wise summation method. Field observation data collected at the Chengde airport are used to verify this method. Comparison of the calculations and field data shows that new method is able to achieve reliable predictions of post-construction settlement and hence to provide useful guidance for the following construction of the airport.

源语言英语
页(从-至)1-10
页数10
期刊Shuili Fadian Xuebao/Journal of Hydroelectric Engineering
35
3
DOI
出版状态已出版 - 25 3月 2016

指纹

探究 'Computational method of post-construction settlement for high-fill embankments' 的科研主题。它们共同构成独一无二的指纹。

引用此