Buffer sizing methods of critical chain based on Parkinson's law

  • Ming Li*
  • , Zhe Xu
  • , Jing Yu
  • *此作品的通讯作者
  • Beihang University
  • Shijiazhuang Tiedao University

科研成果: 期刊稿件文章同行评审

摘要

Considering the effect of Parkinson's law on human psychological behavior, a new assumption of activity completion time in critical chain project scheduling was proposed. Based on this assumption, the project buffer setting method by considering average time deviation and the feeding buffer setting method by considering parallel relationship were designed. Project buffer size determined by the new method was greater than that of Root Square Error (RSE) method, but the feeding buffer size of this method was smaller than that of RSE method. The simulation results showed that the new project buffer setting method could provide more reliable security time for the project. Besides, adopting smaller feeding buffer sizes would not cause any significant influence on the project duration.

源语言英语
页(从-至)3177-3183
页数7
期刊Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS
19
12
DOI
出版状态已出版 - 12月 2013

学术指纹

探究 'Buffer sizing methods of critical chain based on Parkinson's law' 的科研主题。它们共同构成独一无二的学术指纹。

引用此