摘要
This paper presents a risk evaluation model of excavation system. The model is developed based on extended TODIM method (TODIM is an acronym in Portuguese for Interactive Multi-criteria Decision Making). Developed model consists of three phases: data collection and benchmark risk level classification, extended TODIM method application and risk status perception. Excavation system is divided into 19 sub-systems based on monitored scheme, and twelve influential factors are determined. Sub-systems of excavation in high risk status are identified via the developed model. Impacts of coefficient θ in extended TODIM method on risk status results are investigated. An excavation construction project in Tianjin is adopted. Evaluation results show that sub-systems with high-risk status can be identified, which are consistent with the engineering practices. Finally, sensitivity analysis is conducted to increase the robustness of developed model. The developed model can provide a comprehensive risk status perception of sub-systems of excavation which can mitigate and manage the risks during excavation construction.
| 源语言 | 英语 |
|---|---|
| 页(从-至) | 1053-1069 |
| 页数 | 17 |
| 期刊 | Acta Geotechnica |
| 卷 | 17 |
| 期 | 4 |
| DOI | |
| 出版状态 | 已出版 - 4月 2022 |
| 已对外发布 | 是 |
指纹
探究 'An extended TODIM-based model for evaluating risks of excavation system' 的科研主题。它们共同构成独一无二的指纹。引用此
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver