Activity flow optimization and risk evaluation of complex project

  • Dong Yu Chen*
  • , Wan Hua Qiu
  • , Min Yang
  • , Leung Mei-yung
  • *此作品的通讯作者
  • Beihang University
  • City University of Hong Kong

科研成果: 书/报告/会议事项章节会议稿件同行评审

摘要

In order to effectively control the schedule and cost of complex project, this paper proposes an algorithm for optimizing activity sequences and a model for evaluating schedule/cost risks based on Dependency Structural Matrix (DSM) theory. The activity optimization algorithm aims to reduce unnecessary activity rework by arranging activity execution order properly. Risk evaluation model also takes account of the uncertainties of project activities as well as learning effects. The simulation result indicates that our optimization algorithm can effectively reduce cost and compress schedule for complex projects.

源语言英语
主期刊名2007 International Conference on Wireless Communications, Networking and Mobile Computing, WiCOM 2007
5191-5194
页数4
DOI
出版状态已出版 - 2007
活动2007 International Conference on Wireless Communications, Networking and Mobile Computing, WiCOM 2007 - Shanghai, 中国
期限: 21 9月 200725 9月 2007

出版系列

姓名2007 International Conference on Wireless Communications, Networking and Mobile Computing, WiCOM 2007

会议

会议2007 International Conference on Wireless Communications, Networking and Mobile Computing, WiCOM 2007
国家/地区中国
Shanghai
时期21/09/0725/09/07

指纹

探究 'Activity flow optimization and risk evaluation of complex project' 的科研主题。它们共同构成独一无二的指纹。

引用此