摘要
In view of the weaknesses on evaluation attributes weighting and data mining form sample data matrix in traditional VIKOR algorithm, an improved VIKOR algorithm is proposed. In the procedure of this algorithm, the combinational weights of evaluation attributes determined by AHP and entropy weighting so as to take subjective experience and objective data law into consideration simultaneously. Moreover, a grey relational coefficient matrix between the selected alternatives and ideal alternative was calculated as the new decision matrix by grey relational analysis, and the selection of alternative achieved. In addition, a two-stage optimizing method for earth-rock allocation based on the improved VIKOR established for solving the earth-rock allocation problem in hydropower project. A certain hydropower project presented to illustrate the proposed method. Results show that it is feasible and effective to be applied to scheme demonstration in hydropower project bidding.
| 源语言 | 英语 |
|---|---|
| 页(从-至) | 369-373 |
| 页数 | 5 |
| 期刊 | Beijing Ligong Daxue Xuebao/Transaction of Beijing Institute of Technology |
| 卷 | 30 |
| 期 | 3 |
| 出版状态 | 已出版 - 3月 2010 |
指纹
探究 'A two-stage optimizing method for earth-rock allocation based on improved VIKOR' 的科研主题。它们共同构成独一无二的指纹。引用此
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver