A two-phase preventive maintenance policy considering imperfect repair and postponed replacement

  • Li Yang
  • , Zhi sheng Ye
  • , Chi Guhn Lee
  • , Su fen Yang
  • , Rui Peng*
  • *此作品的通讯作者
  • University of Toronto
  • National University of Singapore
  • National Chengchi University
  • University of Science and Technology Beijing

科研成果: 期刊稿件文章同行评审

摘要

This paper investigates a novel two-phase preventive maintenance policy for a single-component system with an objective of maximizing the revenue generated by the performance-based contracting (PBC). The system undergoes a defective state before failure, and produces signal hinting the condition. The maintenance policy consists of two phases: imperfect maintenance phase followed by postponed replacement phase. In the imperfect maintenance phase, inspection is performed to reveal the defective state, leading to a possible repair. Both the inspection and the repair are imperfect. In the postponed replacement phase, preventive replacement is performed during the upcoming scheduled maintenance window, before which no inspection or repair is executed. The expected net revenue under PBC is maximized via the joint optimization of the inspection interval, number of inspection and preventive replacement interval. We apply the model to a case from a steel converter plant, and the results show that our proposed maintenance policy outperforms some existing maintenance policies in terms of the net revenue.

源语言英语
页(从-至)966-977
页数12
期刊European Journal of Operational Research
274
3
DOI
出版状态已出版 - 1 5月 2019
已对外发布