跳到主要导航 跳到搜索 跳到主要内容

A Two-Layer Approach for the Decentralized Multi-Project Scheduling Problem Sharing Multi-Skilled Staff

  • Weibao You
  • , Zhe Xu*
  • , Song Zhao
  • *此作品的通讯作者
  • Beihang University

科研成果: 期刊稿件文章同行评审

摘要

With the rapid development of economic globalization and information technology, the projects undertaken by enterprises are gradually becoming larger and more complex. The multi-project management model has become the norm in enterprise management, and it shows a trend of decentralization in terms of geographical distribution and management environment. This decentralization mainly manifests in the fact that each project has its own private information and benefit objectives and shares limited global resources with other projects during the execution process, forming a decentralized decision-making environment. As an extension of the resource-constrained project scheduling problem, the decentralized resource-constrained multi-project scheduling problem integrates single-project scheduling and global resource coordination allocation in a decentralized decision-making environment with multiple independent decision-makers. Furthermore, when considering global resources as multi-skilled staff, the decentralized multi-project scheduling problem sharing multi-skilled staff studied in this paper is proposed. A two-layer model containing local scheduling and global coordination decision-making is established to describe this problem. A two-layer approach (TLA) is proposed to solve this problem. In the local scheduling layer, a bat algorithm based on forward-backward scheduling (BAFBS) is developed to generate local baseline schedules to minimize the single-project completion time. In the global coordination decision-making layer, a variable neighborhood tabu search algorithm with greedy assignment strategy is designed to resolve global resource conflicts to minimize the multi-project total tardiness cost. Computational experiments are conducted based on the Multi-Project Scheduling Problem LIBrary dataset. The results show that the BAFBS can obtain high-quality local baseline schedules. Compared to the existing decentralized and centralized methods, our proposed TLA can get better solutions on most problem subsets, which proves that our approach can effectively coordinate the allocation of multi-skilled staff among multiple projects.

源语言英语
页(从-至)29204-29221
页数18
期刊IEEE Access
12
DOI
出版状态已出版 - 2024

联合国可持续发展目标

此成果有助于实现下列可持续发展目标:

  1. 可持续发展目标 8 - 体面工作和经济增长
    可持续发展目标 8 体面工作和经济增长

指纹

探究 'A Two-Layer Approach for the Decentralized Multi-Project Scheduling Problem Sharing Multi-Skilled Staff' 的科研主题。它们共同构成独一无二的指纹。

引用此