跳到主要导航 跳到搜索 跳到主要内容

A scheduling algorithm for multi-workshop production based on bom and process route

  • Beihang University

科研成果: 期刊稿件文章同行评审

摘要

For the scheduling problem of complex products in multi-workshop production, this paper studied the BOM (Bill of Materials) structure of complex products and the characteristics of the process route and developed the construction method of a multi-level process network diagram. Based on this, a comprehensive mathematical model for scheduling on multi-workshop production was proposed. An improved particle swarm algorithm (PSO) was proposed to solve the problem. By constructing the network subgraph, the invalid search path of the algorithm was avoided, and the efficiency of the algorithm was improved. In addition, for the scheduling problem with product time constraints, this paper presented a path search rescheduling strategy to ensure that the algorithm could obtain an effective search path. Finally, the model and algorithm were verified through a case study. This paper optimized the parameters of the algorithm by different tests and obtained the optimal range of the parameters. At the same time, through the analysis of the scheduling of complex products in a multi-workshop environment, the effectiveness and practicability of the above methods were verified.

源语言英语
文章编号5078
期刊Applied Sciences (Switzerland)
11
11
DOI
出版状态已出版 - 1 6月 2021

指纹

探究 'A scheduling algorithm for multi-workshop production based on bom and process route' 的科研主题。它们共同构成独一无二的指纹。

引用此