带有活动重叠的项目调度问题新算法: 分支定界法

  • Jing Yu
  • , Zhe Xu*
  • , Fang Xie
  • *此作品的通讯作者
  • Tianjin University of Technology
  • Shandong Technology and Business University

科研成果: 期刊稿件文章同行评审

摘要

In the complex product research and experimental development project, activities overlapping is usually used to shorten project duration. Currently, most methods for resource constrained project scheduling problem with activities overlapping are based on heuristic algorithm. This method has the advantages of fast-speed convergence and large-scale calculation, but cannot obtain the optimal solution. The accurate algorithm is an effective method to solve the optimal solution of the above problem. Therefore, a branch and bound method is designed to obtain the optimal solution according to examine the impact of overlapping activities on project scheduling. Firstly, the optimality of the algorithm is proved in theory. The optimal solution can be obtained only by considering the minimum delay substitution set, and cut set domination rule and left shift domination rule in pruning operation is proved. Secondly, in the algorithm design, the data structure–stack is used to store the node information on the search tree, and for the activities overlapping constraint, a new decision point and a new representation method of the search tree node are defined. Finally, the feasibility and effectiveness of the algorithm are verified by a large number of instances. In conclusion, the proposed algorithm has high research value with mature theoretical significance and accurate calculation results.

投稿的翻译标题A branch and bound method for project scheduling problem with activities overlapping
源语言繁体中文
页(从-至)115-126
页数12
期刊Operations Research Transactions
27
1
DOI
出版状态已出版 - 15 3月 2023

关键词

  • activity overlapping
  • branch and bound method
  • project scheduling
  • stack