跳到主要导航 跳到搜索 跳到主要内容

卫星总装数字孪生车间物料准时配送方法

科研成果: 期刊稿件文章同行评审

摘要

The satellite assembly shop-floor is transforming from the traditional single-satellite and single-station assembly mode into the multi-satellite batch pulsing assembly mode. However, the asynchronous of assembly execution and material distribution is one of the important factors affecting the efficiency and quality of satellite assembly. To solve this problem, a just-in-time material distribution method based on grey theory and multi-model interaction mechanism was proposed, which was suitable for satellite assembly digital twin shop-floor. Aiming at the completion time uncertainty of the personnel operations in the process completion time prediction problem, a method of predicting material demand time based on grey theory was proposed. A time-controlled path planning method was proposed to solve the collision problem between mobile carriers with a guide rail and without one. A multi-model interaction mechanism was established through the time window to ensure that carriers did not collide between paths. The application verification was carried out in the satellite assembly digital twin shop-floor. The result suggested that the proposed method could effectively reduce the prediction error caused by differences among workers, and effectively solve the problem that the time of path planning was uncontrollable in the mixed environment.

投稿的翻译标题Just-in-time material distribution method for satellite assembly digital twin shop-floor
源语言繁体中文
页(从-至)2897-2914
页数18
期刊Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS
26
11
DOI
出版状态已出版 - 11月 2020

关键词

  • Digital twin
  • Material distribution
  • Path planning
  • Satellite assembly
  • Time prediction

指纹

探究 '卫星总装数字孪生车间物料准时配送方法' 的科研主题。它们共同构成独一无二的指纹。

引用此