加工时间为区间数的两阶段流水生产鲁棒调度

  • Southeast University, Nanjing

科研成果: 期刊稿件文章同行评审

摘要

Since processing times are usually uncertain in discrete manufacturing industry, it is hard to implement production schedules as planned. The robust scheduling of two-stage flow shop with interval processing times is studied, which aims to solve robust schedules conformed to the Min-Max decision rule. The corresponding original scheduling problem is to minimize total completion times. Firstly, the robust scheduling problem is modeled as a semi-infinite programming formulation. Secondly, three theorems are proved and a hybrid algorithm is provided to combine branch-bound method and genetic algorithm, which contribute to solve the problem effectively and efficiently. At last, a computational experiment is conducted to illustrate the robust scheduling problem that can be solved through the modeling method and the hybrid algorithm proposed in this paper.

投稿的翻译标题Robust Scheduling of Two-Stage Flow Shop with Interval Processing Times
源语言繁体中文
页(从-至)266-273
页数8
期刊Computer Engineering and Applications
59
20
DOI
出版状态已出版 - 15 10月 2023

关键词

  • Min-Max decision rule
  • bound-genetic hybrid algorithm
  • branch
  • robust scheduling
  • total completion times
  • two-stage flow shop

指纹

探究 '加工时间为区间数的两阶段流水生产鲁棒调度' 的科研主题。它们共同构成独一无二的指纹。

引用此