Study on the organization and work breakdown structure of the international academic conference event management - Take the 38th International Conference on Computers and Industrial Engineering for Example

  • Di Zhang*
  • , Xiuquan Deng
  • , Rongjun Zou
  • *Corresponding author for this work
  • Beihang University

Research output: Chapter in Book/Report/Conference proceedingConference contributionpeer-review

Abstract

The characteristics of international academic conference is analyzed specifically, the principle and process to design the organization structure and work breakdown structure (WBS) of international academic conference are proposed on the basis of the theory of event management and work breakdown structure in project management. Then the reference organization structure and general WBS of international academic conference are built. Finally, the actual value of the research is showed by being applied into the 38th International Conference on Computers and Industrial Engineering (CIE) and generating the specific responsibility matrix .A suitable way for the majority of international academic organizations can be attempted to explore to make the organization of international academic conference more subtle, specific, greater controllability.

Original languageEnglish
Title of host publicationIE and EM 2009 - Proceedings 2009 IEEE 16th International Conference on Industrial Engineering and Engineering Management
Pages1611-1615
Number of pages5
DOIs
StatePublished - 2009
Event2009 IEEE 16th International Conference on Industrial Engineering and Engineering Management, IE and EM 2009 - Beijing, China
Duration: 21 Oct 200923 Oct 2009

Publication series

NameIE and EM 2009 - Proceedings 2009 IEEE 16th International Conference on Industrial Engineering and Engineering Management

Conference

Conference2009 IEEE 16th International Conference on Industrial Engineering and Engineering Management, IE and EM 2009
Country/TerritoryChina
CityBeijing
Period21/10/0923/10/09

Keywords

  • Event management
  • International academic conference
  • Organization structure
  • WBS

Fingerprint

Dive into the research topics of 'Study on the organization and work breakdown structure of the international academic conference event management - Take the 38th International Conference on Computers and Industrial Engineering for Example'. Together they form a unique fingerprint.

Cite this