Scientometric review of construction project schedule studies: Trends, gaps and potential research areas

  • Beihang University
  • Beijing Key Laboratory of Emergency Support Simulation Technologies for City Operations
  • Ministry of Transport of the People's Republic of China
  • Beijing International Science and Technology Cooperation Base for City Safety Operation and Emergency Support

Research output: Contribution to journalReview articlepeer-review

Abstract

Scheduling plays a fundamental role in construction projects’ success and thus has drawn attention from both academic researchers and industry practitioners. A large number of research articles tend to solve emerging challenges in construction project schedule (CPS). Therefore, there is a strong need of systematic review on existing studies. In this study, a total of 332 articles were retrieved from Scopus database using title, abstract and keywords with respect to CPS and filtered by document type, language type and abstract content. In particular, science mapping approach was adopted to analyse selected journal articles. These articles were examined using three sequential processes, including bibliometric search, scientometric analysis, and in-depth qualitative discussion. It could demonstrate the most influential journals, researchers, published articles, and active countries/regions in this area. In addition, major CPS knowledge areas were identified and summarized as CPS constructability, applications of variety of CPS methods, CPS optimization models and algorithms, identification and quantification of schedule risks and uncertainties, CPS performance management, and adopting new emerging CPS technologies and methods. Furthermore, knowledge gaps and future potential research directions were also discussed in detail. Finally, a comprehensive CPS framework was proposed as a sound reference in future research.

Original languageEnglish
Pages (from-to)343-363
Number of pages21
JournalJournal of Civil Engineering and Management
Volume26
Issue number4
DOIs
StatePublished - 9 Apr 2020

Keywords

  • Bibliometric
  • Construction project schedule (CPS)
  • Resource-constrained scheduling
  • Schedule optimization
  • Schedule uncertainties
  • Scheduling methods
  • Scientometric analysis

Fingerprint

Dive into the research topics of 'Scientometric review of construction project schedule studies: Trends, gaps and potential research areas'. Together they form a unique fingerprint.