Abstract
The scheduling model of multi-stage manufacturing systems with multiple job classes and variable production capacity constraints at workstations was built to make the total cost minimum. On the basis of analyzing optimal conditions, the prices of production capacities or resources were derived and explained in economic meaning. It has been shown that the dynamic scheduling model can be transformed into the equivalent static minimum cost flow problem over space-time extended network. The modified Frank-Wolfe algorithm was used to solve the equivalent problem. The illustrative example was given.
| Original language | English |
|---|---|
| Pages (from-to) | 579-583 |
| Number of pages | 5 |
| Journal | Beijing Hangkong Hangtian Daxue Xuebao/Journal of Beijing University of Aeronautics and Astronautics |
| Volume | 24 |
| Issue number | 5 |
| State | Published - 1998 |
| Externally published | Yes |
Fingerprint
Dive into the research topics of 'Scheduling model and resource pricing in multi-stage manufacturing systems'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver