Robust optimization algorithm for integrated crane assignment and scheduling in slab yard with uncertain arrival time

  • Xu Wang
  • , Qiuhong Zhao*
  • , Shixin Liu
  • , Jia Wang
  • , Liang Qi
  • *Corresponding author for this work

Research output: Contribution to journalArticlepeer-review

Abstract

A slab yard served as a key component of the iron and steel plant. Effective slab yard crane assignment and scheduling directly affect the overall efficiency of the steel production process. This work addresses an uncertain slab yard crane assignment and scheduling problem (SYCAS) with the fluctuating arrival time. A stochastic programming model is established to obtain a robust solution that minimises the completion time of slab groups under uncertainty. Due to its NP-hardness, we developed an improved column and cut generation method (IC&CG), which divides the problem into a relaxed master problem (RMP) and a slave problem (SP). A new initialisation strategy for obtaining high-quality solutions and an acceleration strategy for discarding irrelevant scenarios are proposed. We use small-size instances to compare the performance of IC&CG with CPLEX and a generalised column and cut generation method in both deterministic and uncertain environments to validate the effectiveness of the method. For large-size instances, a lower bound (LB) of the optimal objective function is proposed to show the effectiveness of IC&CG. Furthermore, we prove the robustness of the method by sensitive analysis.

Original languageEnglish
Pages (from-to)1707-1724
Number of pages18
JournalInternational Journal of Production Research
Volume63
Issue number5
DOIs
StatePublished - 2025

Keywords

  • Slab yard
  • improved column and cut generation method
  • integrated crane assignment and scheduling
  • robustness

Fingerprint

Dive into the research topics of 'Robust optimization algorithm for integrated crane assignment and scheduling in slab yard with uncertain arrival time'. Together they form a unique fingerprint.