Resource-constraint Multi-project Scheduling with Priorities and Uncertain Activity Durations

  • Zheng Zheng*
  • , Lin Shumin
  • , Guo Ze
  • , Zhu Yueni
  • *Corresponding author for this work

Research output: Contribution to journalArticlepeer-review

Abstract

Resource-constraint multi-project scheduling is one of the most important topic in the field of project management. Most current works solve this problem based on an idea that multiple projects can be simply emerged into a super-project in a deterministic environment, regardless of the project priority and robustness of schedules. This paper discusses the RCMPSP with priority and formulates a discrete bi-objective decision model. A modified NSGA-II based algorithm is presented to solve the model. Furthermore, we design systematic experiments to investigate the interrelationship between robustness and its related project parameters, including order strength, resource constrainedness and uncertainty level. The results demonstrate the effectiveness of the solution algorithm and show that the three parameters indeed have evident impacts on the robustness and makespan of projects.

Original languageEnglish
Pages (from-to)530-547
Number of pages18
JournalInternational Journal of Computational Intelligence Systems
Volume6
Issue number3
DOIs
StatePublished - May 2013

Keywords

  • Multi-Project Scheduling
  • Priorities
  • Robustness
  • Uncertain Activity Durations
  • Uncertainty