Abstract
Aiming at the possible fault in single-machine production, a multi-objective optimization of robust scheduling method was researched with objectives of robustness and maximum lateness. The algorithm to solve the optimal robust scheduling was proposed, and the scheduling robustness optimization method was given under the maximum lateness. The solving method for Pareto solution was provided with the objective of scheduling robustness and maximum lateness. The applicability and effectiveness of proposed method was verified by simulation experiment.
| Original language | English |
|---|---|
| Pages (from-to) | 2459-2466 |
| Number of pages | 8 |
| Journal | Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS |
| Volume | 19 |
| Issue number | 10 |
| DOIs | |
| State | Published - Oct 2013 |
Keywords
- Maximum lateness
- Multi-objective optimization
- Robust scheduling
- Single-machine
Fingerprint
Dive into the research topics of 'Multi-objective optimization for robust single-machine scheduling'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver