Skip to main navigation Skip to search Skip to main content

Multi-mode resource-constrained project scheduling with uncertain activity cost

  • Fang Xie
  • , Haitao Li*
  • , Zhe Xu
  • *Corresponding author for this work
  • Shandong Technology and Business University
  • University of Missouri at St. Louis

Research output: Contribution to journalArticlepeer-review

Abstract

The multi-mode resource-constrained project scheduling problem under uncertain activity cost (MRCPSP-UAC) has a wide range of applications in production planning and project management. We first build a new mixed-integer nonlinear programming (MINLP) model with the objective of minimizing the risk of project cost overrun, which provides a vehicle to obtain optimal solutions. To overcome the computational challenge of exact method for solving large instances, we devise a construction heuristic (CH) with a multi-pass greedy improvement procedure to obtain a feasible solution efficiently. To further improve solution quality, a hybrid CH and genetic algorithm (CH-GA) is developed with a custom fitness function to properly calibrate the quality of an individual. A comprehensive computational study is performed to examine the impact of various problem parameters on the optimal solutions, and the performance of our algorithms. Our hybrid CH-GA performs well for large instances with significantly less computational time than the exact method.

Original languageEnglish
Article number114475
JournalExpert Systems with Applications
Volume168
DOIs
StatePublished - 15 Apr 2021

Keywords

  • Genetic algorithms
  • Mixed-integer nonlinear programming
  • Multi-mode
  • Resource-constrained project scheduling
  • Uncertain activity cost

Fingerprint

Dive into the research topics of 'Multi-mode resource-constrained project scheduling with uncertain activity cost'. Together they form a unique fingerprint.

Cite this