Integrated optimization of order assignment and joint production-transportation scheduling with commit-to-delivery mode

  • Zheng Dao Li
  • , Hong Zhou*
  • *Corresponding author for this work

Research output: Contribution to journalArticlepeer-review

Abstract

Aiming at the make-to-order enterprises with commit-to-delivery, the existing researches were expanded to multi-plant layout to investigate the integrated scheduling of order assignment and production-delivery, which could minimize the total costs of production and transportation. The analysis result showed the computing complexity of NP-Hard for this problem, and a three-steps heuristics method of polynomial time complexity was proposed. The result indicated that the worst case performance of this method was bounded by Lmax+1, and the near-optimal solution would generate and the tight bounds would obtain by this method.

Original languageEnglish
Pages (from-to)1643-1653
Number of pages11
JournalJisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS
Volume20
Issue number7
DOIs
StatePublished - 1 Jul 2014

Keywords

  • Commit-to-delivery
  • Heuristic method
  • Integrated optimization
  • Make-to-order