Abstract
Aiming at the make-to-order enterprises with commit-to-delivery, the existing researches were expanded to multi-plant layout to investigate the integrated scheduling of order assignment and production-delivery, which could minimize the total costs of production and transportation. The analysis result showed the computing complexity of NP-Hard for this problem, and a three-steps heuristics method of polynomial time complexity was proposed. The result indicated that the worst case performance of this method was bounded by Lmax+1, and the near-optimal solution would generate and the tight bounds would obtain by this method.
| Original language | English |
|---|---|
| Pages (from-to) | 1643-1653 |
| Number of pages | 11 |
| Journal | Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS |
| Volume | 20 |
| Issue number | 7 |
| DOIs | |
| State | Published - 1 Jul 2014 |
Keywords
- Commit-to-delivery
- Heuristic method
- Integrated optimization
- Make-to-order
Fingerprint
Dive into the research topics of 'Integrated optimization of order assignment and joint production-transportation scheduling with commit-to-delivery mode'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver