Skip to main navigation Skip to search Skip to main content

Inspection Allocation Optimization with Resource Constraints Based on Modified NSGA-II in Flexible Manufacturing Systems

  • Yingchao You
  • , Guijiang Duan*
  • , Rui Liu
  • , Taotao Liu
  • , Mingcong Huang
  • *Corresponding author for this work
  • Beihang University
  • China Aviation Industry Corporation

Research output: Contribution to journalArticlepeer-review

Abstract

With the development of smart manufacturing, quality has become an indispensable issue in the manufacturing process. Although there is increasing publication about inspection allocation problems, inspection allocation optimization research considering resource capability is scarce. This paper focuses on the inspection allocation problem with resource constraints in the flexible manufacturing system. Combined with the inspection resource capability model, a bi-objective model is developed to minimize the cost and balance loads of the inspection station. A modified NSGA-II algorithm with adaptive mutation operators is suggested to deal with the proposed model. Finally, a simulation experiment is conducted to test the performance of the modified algorithm and the results demonstrate that modified NSGA-II can obtain acceptable inspection solutions.

Original languageEnglish
Article number3976576
JournalMathematical Problems in Engineering
Volume2021
DOIs
StatePublished - 2021

Fingerprint

Dive into the research topics of 'Inspection Allocation Optimization with Resource Constraints Based on Modified NSGA-II in Flexible Manufacturing Systems'. Together they form a unique fingerprint.

Cite this