Skip to main navigation Skip to search Skip to main content

Improved repair-based constraint satisfaction method for flow shop scheduling

  • Chun Xia Shangguan*
  • , Hong Zhou
  • , Rui Feng Shi
  • , Yang Wu
  • *Corresponding author for this work
  • Beihang University
  • North China Electric Power University

Research output: Contribution to journalArticlepeer-review

Abstract

Repair-based constraint satisfaction method is one of the two main categories of constraint satisfaction (CS) algorithms. It starts with an arbitrary completed solution, and then resolves conflicts by local repair. An improved repair-based constraint satisfaction (1RCS_WT) method for flow shop scheduling is proposed. In IRCS_WT, a heuristic rule of largest weighted tardiness priority (LWT) is proposed for variables ordering procedure, and a new heuristic of largest tardy and early variables exchanging (LTEE) is designed to escape from local optima. Computational experiments of 31 flow shop scheduling problems are conducted to compare the IRCS_WT with other two heuristic methods, extended NEH and filtered beam search (FBS), as well as genetic algorithm (GA). The results show that IRCS_WT significantly outperforms the competitors with the same running time.

Original languageEnglish
Pages (from-to)850-856
Number of pages7
JournalKongzhi yu Juece/Control and Decision
Volume23
Issue number8
StatePublished - Aug 2008

Keywords

  • Constraint satisfaction
  • Flow shop scheduling
  • Repair-based method
  • Total weighted tardiness

Fingerprint

Dive into the research topics of 'Improved repair-based constraint satisfaction method for flow shop scheduling'. Together they form a unique fingerprint.

Cite this