End-to-End Delay Analysis Considering Partition Scheduling on a DIMA Platform

  • Wei Xiang
  • , Feng He*
  • *Corresponding author for this work

Research output: Chapter in Book/Report/Conference proceedingConference contributionpeer-review

Abstract

With the evolution of the avionics system architecture, the trend of function software and software-intensive has become increasingly prominent. Compared with the current IMA (Integrated Modular Avionics) system design, DIMA (Distributed Integrated Modular Avionics) is regarded as the future development direction of a new generation of avionics systems. The DIMA architecture effectively modifies the problem of fault isolation, system reconfiguration mechanisms and resource utilization in IMA architecture. However, the existing worst-case delay scheduling strategy cannot solve the disadvantages of AFDX (Avionics Full-DupleX Switched Ethernet) as an asynchronous network. Therefore, we propose a delay analysis method considering partition scheduling on DIMA platform, which can reduce the disorder for uncertainty from the source of the system.In this paper, to solve real-time performance evaluation problem on DIMA platform, a network calculus method by integrating offsets on DIMA platform was proposed. And in order to reduce the uncertainty from the source of the system, a partition scheduling strategy based on DIMA system is proposed.

Original languageEnglish
Title of host publicationProceedings of TENCON 2018 - 2018 IEEE Region 10 Conference
PublisherInstitute of Electrical and Electronics Engineers Inc.
Pages1548-1553
Number of pages6
ISBN (Electronic)9781538654576
DOIs
StatePublished - 2 Jul 2018
Event2018 IEEE Region 10 Conference, TENCON 2018 - Jeju, Korea, Republic of
Duration: 28 Oct 201831 Oct 2018

Publication series

NameIEEE Region 10 Annual International Conference, Proceedings/TENCON
Volume2018-October
ISSN (Print)2159-3442
ISSN (Electronic)2159-3450

Conference

Conference2018 IEEE Region 10 Conference, TENCON 2018
Country/TerritoryKorea, Republic of
CityJeju
Period28/10/1831/10/18

Keywords

  • AFDX
  • Avionics
  • DIMA
  • Delay analysis
  • Partition scheduling

Fingerprint

Dive into the research topics of 'End-to-End Delay Analysis Considering Partition Scheduling on a DIMA Platform'. Together they form a unique fingerprint.