Abstract
In order to solve the problem that how to choose the part level measuring parameter of supply support efficiency in spare supply provisioning, the mathematics means, physics means, the obtaining difficulty in practical use and the relationship of the same systemic efficiency measuring parameter of the fill rate and backorder based on the origin of the two parameters were analyzed, and then the difference and the contact of the two were observed. The application range of the fill rate and backorder was compared and validated through the application case, which is based on the METRIC model with the considering of the cost affection. The results show that the spare backorder is more exceeding than the spare fill rate in achieving the supply programming, while the spare fill rate is better in scaling the management of spare supply.
| Original language | English |
|---|---|
| Pages (from-to) | 580-583 |
| Number of pages | 4 |
| Journal | Beijing Hangkong Hangtian Daxue Xuebao/Journal of Beijing University of Aeronautics and Astronautics |
| Volume | 34 |
| Issue number | 5 |
| State | Published - May 2008 |
Keywords
- Backorder
- Compare analysis
- Fill rate
- Spare part
Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver