Skip to main navigation Skip to search Skip to main content

Common due date scheduling problem on single machine based on PSO-H algorithm

  • Hong Zhou*
  • , Xue Jing Wu
  • , Xiao Wei Tan
  • *Corresponding author for this work
  • Beihang University

Research output: Contribution to journalArticlepeer-review

Abstract

The classical particle swarm optimization (PSO) is a powerful method to find the minimum for a function optimization problem, especially with a continuous solution space. So far, it is seldom used to solve those problems with discrete features. The problem of scheduling jobs on a single machine against common due dates with respect to earliness and tardiness (E/T) penalties was dealt. At the same time, a PSO strategy integrated with a kind of heuristic algorithm was proposed, where the heuristic information is composed of the processing time and tardiness penalty for each job. It is indicated that such strategy can significantly improve the performance of the solutions. Benchmark testing from OR-Library demonstrates that the algorithm is both effective and efficient in achieving satisfied solutions for scheduling problems with earliness and tardiness penalties.

Original languageEnglish
Pages (from-to)1933-1936
Number of pages4
JournalXitong Fangzhen Xuebao / Journal of System Simulation
Volume19
Issue number9
StatePublished - 5 May 2007

Keywords

  • E/T
  • Heuristic
  • Optimization
  • PSO
  • Scheduling

Fingerprint

Dive into the research topics of 'Common due date scheduling problem on single machine based on PSO-H algorithm'. Together they form a unique fingerprint.

Cite this