Bi-objective scheduling optimization for discrete time/cost trade-offin projects

  • Hongbo Li
  • , Zhe Xu
  • , Wenchao Wei*
  • *Corresponding author for this work
  • Shanghai University
  • Beijing Jiaotong University

Research output: Contribution to journalArticlepeer-review

Abstract

In sustainable project management, time and cost are two critical factors affecting the success of a project. Time/cost trade-offs in projects accelerate the execution of some activities by increasing the amount of non-renewable resources committed to them and therefore shorten the project duration. The discrete time/cost trade-offproblem (DTCTP) has been extensively studied during the past 20 years. However, due to its complexity, the DTCTP-especially the DTCTP curve problem (DTCTP-C)-has only been solved for relatively small instances. To the best of our knowledge, there is no computational performance analysis for solving the DTCTP-C on large project instances with up to 500 activities. This paper aims to fill this gap. We present two bi-objective heuristic algorithms for the DTCTP-C where both project duration and cost are minimized. The objective is to obtain a good appropriate efficient set for the large-scale instances. The first algorithm is based on the non-dominated sorting genetic algorithm II (NSGA-II) and uses a specially designed critical path-based crossover operator. The second algorithm is a steepest descent heuristic which generates efficient solutions by iteratively solving the DTCTP with different deadlines. Computational experiments are conducted to validate the proposed algorithms on a large set of randomly generated problem instances.

Original languageEnglish
Article number2802
JournalSustainability (Switzerland)
Volume10
Issue number8
DOIs
StatePublished - 7 Aug 2018

UN SDGs

This output contributes to the following UN Sustainable Development Goals (SDGs)

  1. SDG 7 - Affordable and Clean Energy
    SDG 7 Affordable and Clean Energy

Keywords

  • Bi-objective optimization
  • Discrete time/cost trade-off
  • Heuristics
  • Project scheduling

Fingerprint

Dive into the research topics of 'Bi-objective scheduling optimization for discrete time/cost trade-offin projects'. Together they form a unique fingerprint.

Cite this