Skip to main navigation Skip to search Skip to main content

Application of grey prediction models in final assembly duration of civil aircraft

Research output: Chapter in Book/Report/Conference proceedingConference contributionpeer-review

Abstract

As a basis for rational organized production, yearly production program and production planning are made respectively according to assembly cycle, which is a significant link of the whole process and has a great impact on the performance, lifespan and cost of production itself. Aiming at the complicated process of airplane assembly and less sample data, combining with the characteristics of Grey System Theory, this paper chooses the GM (1, N) to obtain a precise model by estimating the aircraft assembly duration.

Original languageEnglish
Title of host publication2011 IEEE 18th International Conference on Industrial Engineering and Engineering Management, IE and EM 2011
Pages1648-1650
Number of pages3
EditionPART 3
DOIs
StatePublished - 2011
Event2011 IEEE 18th International Conference on Industrial Engineering and Engineering Management, IE and EM 2011 - Changchun, China
Duration: 3 Sep 20115 Sep 2011

Publication series

Name2011 IEEE 18th International Conference on Industrial Engineering and Engineering Management, IE and EM 2011
NumberPART 3

Conference

Conference2011 IEEE 18th International Conference on Industrial Engineering and Engineering Management, IE and EM 2011
Country/TerritoryChina
CityChangchun
Period3/09/115/09/11

Keywords

  • Grey system theory
  • aircraft final assembly
  • estimate

Fingerprint

Dive into the research topics of 'Application of grey prediction models in final assembly duration of civil aircraft'. Together they form a unique fingerprint.

Cite this