@inproceedings{0653a9a598d14e01a8fdcd7c06b5c590,
title = "Analysis of multi-functional support equipment failure impacting on maintenance waiting time",
abstract = "In order to analyze the impact of multi-functional support equipment failure, tasks of multi-functional support equipment during maintenance process were described, and maintenance plan of multi-functional support equipment was taken into consideration. Maintenance support process model considering multi-functional support equipment failure was put forward, and thereafter a simulation model was built up. Based on the model, analysis of impact which results from quantity and mean-time-between-failures (MTBF) of multifunctional support equipment on maintenance waiting time were carried out. The article provides a useful method for carrying out logistics of multi-functional support equipment and puts forward multi-functional support equipment reliability parameters.",
keywords = "System engineering, logistics, multi-functional support equipment failure, reliability, simulation",
author = "Yan Wang and Lin Ma and Linhan Guo and Rui Kang",
year = "2011",
doi = "10.1109/ICRMS.2011.5979381",
language = "英语",
isbn = "9781612846644",
series = "ICRMS'2011 - Safety First, Reliability Primary: Proceedings of 2011 9th International Conference on Reliability, Maintainability and Safety",
pages = "833--837",
booktitle = "ICRMS'2011 - Safety First, Reliability Primary",
note = "2011 9th International Conference on Reliability, Maintainability and Safety: Safety First, Reliability Primary, ICRMS'2011 ; Conference date: 12-06-2011 Through 15-06-2011",
}