Analysis methods on life cycle reliable performance index of construction engineering structure

  • Jin Dong*
  • , Fa Jie Wei
  • *Corresponding author for this work

Research output: Chapter in Book/Report/Conference proceedingConference contributionpeer-review

Abstract

The life cycle performance indicator of construction engineering structure is the basic indicator of the core research indicator system of construction engineering life cycle. This paper have the reliability indicator of construction structure as a foundation, analyzed the general calculating methods of construction structure and reliable performance. On the other hand, it establishes prediction model of construction structure durability based on Markova chain, and introduces a practical case to analysis and test.

Original languageEnglish
Title of host publicationAdvanced Research on Advanced Structure, Materials and Engineering, ASME 2011
PublisherTrans Tech Publications Ltd
Pages75-79
Number of pages5
ISBN (Print)9783037852996
DOIs
StatePublished - 2012
Event2011 International Conference on Advanced Research on Advanced Structure, Materials and Engineering, ASME 2011 - Beijing, China
Duration: 24 Dec 201125 Dec 2011

Publication series

NameAdvanced Materials Research
Volume382
ISSN (Print)1022-6680

Conference

Conference2011 International Conference on Advanced Research on Advanced Structure, Materials and Engineering, ASME 2011
Country/TerritoryChina
CityBeijing
Period24/12/1125/12/11

Keywords

  • Construction engineering
  • Markov chains
  • Reliability prediction
  • Structure

Fingerprint

Dive into the research topics of 'Analysis methods on life cycle reliable performance index of construction engineering structure'. Together they form a unique fingerprint.

Cite this