Algorithm for linear scheduling method with time and distance constraints

Research output: Chapter in Book/Report/Conference proceedingConference contributionpeer-review

Abstract

Time interval and distance interval are the two main constraints restricting the relationship among activities in the linear scheduling method. However, in previous researches, these two constraints are always considered separately, hence resulting in different linear scheduling models. In this paper, a linear scheduling model with two-dimensional constraints, considering both the time interval and the distance interval, was proposed. Meanwhile, a new algorithm was applied to this model. An example from literatures was calculated using the new method, the correctness of which was then confirmed by the results.

Original languageEnglish
Title of host publicationChemical and Mechanical Engineering, Information Technologies
Pages1077-1083
Number of pages7
DOIs
StatePublished - 2013
Event2013 3rd International Symposium on Chemical Engineering and Material Properties, ISCEMP 2013 - Sanya, China
Duration: 22 Jun 201324 Jun 2013

Publication series

NameAdvanced Materials Research
Volume791
ISSN (Print)1022-6680

Conference

Conference2013 3rd International Symposium on Chemical Engineering and Material Properties, ISCEMP 2013
Country/TerritoryChina
CitySanya
Period22/06/1324/06/13

Keywords

  • Linear project
  • Linear scheduling method
  • Production rate
  • Project scheduling