Skip to main navigation Skip to search Skip to main content

A simulation approach for determining maximal control cycle time in force-compliant assembly under contact force/torque constraints

  • Xiaoyao Wang
  • , Xiaohan Qie
  • , Feifei Kong
  • , Fuzhou Du*
  • *Corresponding author for this work
  • Beihang University

Research output: Contribution to journal › Conference article › peer-review

Abstract

Determining the maximum force feedback control cycle time for an assembly task at a given force/torque threshold is an important basis for designing and evaluating the corresponding force-compliant assembly method. For this issue, this paper proposes a simulation method for determining the maximum force feedback cycle time. The feasible region of the assembly process pose is determined by Monte Carlo simulation. Based on the particle swarm optimization, the pose and motion direction that generate the maximum contact force are found in the feasible region. Finally, dynamic simulation is carried out to determine the maximum force feedback control cycle. Experiments carried out for single-hole assembly show that the proposed approach can effectively determine the maximum force feedback control cycle time, and has a comparative advantage in convergence and total time consumption.

Original languageEnglish
Article number012048
JournalJournal of Physics: Conference Series
Volume2787
Issue number1
DOIs
StatePublished - 2024
Event2024 7th International Conference on Intelligent Manufacturing and Automation, IMA 2024 - Virtual, Online, China
Duration: 12 Jan 2024 → 14 Jan 2024

Fingerprint

Dive into the research topics of 'A simulation approach for determining maximal control cycle time in force-compliant assembly under contact force/torque constraints'. Together they form a unique fingerprint.

Cite this